|
The homes are progressing very well and still on track for a completion date of April 2008. We are excited with
changes that are being made, such as electric fireplaces added to all master bedrooms and the family rooms of the B plan.
These photos give an idea of room layouts now that the sheetrock is in

|
| Large masterbed room with fireplace, crown molding and flush mount speakers |
Have you choosen your home yet?

|
| This is a quick peak of the front of the A unit, you can imagine how nice it will look with a accent |
|
 |
|
|
|
 |
 |
|

|
| The custom kitchens and desighs are almost complete |
Each home is a differant color with trim and accent paints all designed to compliment each home individually

These homes are completely insulated, including all interior and exterior wall. A feature found only in the finest
homes. Adding to both noise reduction and energy saving qualities.
|
 |
|
|
|